The Magnolia Center is a 2.67-acre mixed-use commercial development, strategically located in Corinth, Texas. The project comprises a 10,800 sq. ft. office building and a 7,316 sq. ft. retail building featuring a drive-through facility.
The Bailey Ranch Estates, is a meticulously planned 14-acre residential development featuring 48 thoughtfully designed lots alongside a 2.5-acre future industrial site.
The 1711 Single Family Homes project, is a thoughtfully designed 0.75-acre residential development comprising six compact yet comfortable living spaces.
The Belmar Library Outdoor Learning Area Expansion is a small 0.05 acre for Jefferson County Public Library. MES was tasked with designing the grading and civil infrastructure associated with the new learning area.
Modern Engineering Solutions proudly presents the Trinity Retail Plaza, a meticulously designed 2-acre commercial shopping plaza that seamlessly integrates high-quality retail spaces with innovative engineering solutions.
Modern Engineering Solutions is proud to have contributed as a subconsultant to the Prairie Corner Wastewater Lift Station Project, located in Brighton, Colorado.
Last Dollar PUD HOA Wastewater Treatment Improvement
Modern Engineering Solutions is proud to have played a significant role as a subconsultant in the Last Dollar PUD HOA Wastewater Treatment Improvement Project.
Arabian Acres Metropolitan District Distribution System Improvement & Treatment Improvement
The Arabian Acres Metropolitan District Distribution System Improvement Project, an essential initiative aimed at enhancing water distribution infrastructure for a disadvantaged community in Teller County.
Morrison Creek Metropolitan Water & Sanitation District Treatment Improvement
MES proudly contributed to the Morrison Creek Metropolitan Water & Sanitation District Wastewater Treatment Improvement Project; a vital initiative aimed at enhancing wastewater management in Routt County.