Skip to main content

Modern Engineering Solutions

Modern, Cost-Effective Water and Wastewater Engineering

We are a water and wastewater engineering firm helping Texas municipalities, developers, and engineering partners deliver infrastructure projects faster, with fewer TCEQ revisions and predictable costs.

Engineering Built for Outcomes, Not Overhead

Water and wastewater projects fail when schedules slip, designs overreach, or permitting risks are not addressed early. We engineer with those realities in mind.

Value Over
Hours

We do not bill by the hour. We price water and wastewater engineering services around outcomes such as permits secured, schedules protected, and systems sized correctly for construction and long-term operation. 

Speed as a Design Constraint 

Time to permit and time to water matter as much as hydraulics and code compliance. We treat schedule as a core design input from day one because delays often cost more than design fees. 

Deep Work, Not Meeting Culture 

Our engineers are organized for focused problem solving, not constant meetings. Fewer handoffs and fewer revisions lead to cleaner submittals and faster regulatory review. 

AI as Leverage, Not a Shortcut 

We use AI to streamline drafting and documentation so licensed professional engineers can focus on judgment, coordination, and quality. All technical decisions are made and reviewed by PEs

Who We Support

We support Texas clients who need water and wastewater engineering expertise without large-firm overhead or slow delivery.

Municipalities and Water Districts

Small and mid-sized communities facing aging infrastructure, compliance requirements, or funding deadlines. We deliver clear recommendations and designs aligned with local budgets and operational realities. 

Developers and Industrial Owners 

Developers and industrial owners who need fast feasibility answers, realistic construction costs, and a clear path through TCEQ permitting before capital is committed. 

Civil Engineering Firms

Civil firms without in-house water or wastewater capability or firms facing PE bottlenecks. We act as a quiet, dependable utility partner so projects move forward. 

What We Do

We provide comprehensive water and wastewater engineering services with a focus on constructability, permitting success, and cost control.

Wastewater Engineering

Wastewater collection systems, lift stations, treatment plants, infiltration and inflow studies, and facility upgrades. One clear recommendation, realistic cost expectations, and submittals designed to move through review with minimal revisions. 

Water Engineering

Water wells, storage, distribution, and treatment systems designed around source conditions, growth projections, and construction budgets. Early feasibility clarity and designs that protect project schedules.

Civil Engineering

We handle the water and wastewater portion of civil projects so internal teams can move faster. Ideal for firms needing dependable overflow support or specialized utility expertise.

Construction Administration

We stay engaged during construction with fast responses and clear clarifications to prevent change orders caused by ambiguity or misalignment.

Get Permit Solutions, Faster Timeline And Cost Estimate

Projects

From lift stations to treatment plants, MES delivers water and wastewater engineering for Texas municipalities, developers, and engineering firms - fewer revisions, faster approvals, and costs you can count on.

Blog/Newsletter

Ground-level wide shot of a Texas water main hydrostatic pressure test in progress showing a pressurized pipeline test section with pressure gauges visible at the end cap connections and test water flowing into a designated disposal area representing the discharge planning that Modern Engineering Solutions builds into Texas construction project specifications

The water that filled your pipeline during pressure testing does not have the same regulatory status as rain falling off a roof. Before it leaves the site, someone needs to have answered the question of where it is going and under what authorization it is being discharged. Most …

Why Choose Modern Engineering Solutions

  • Clear Direction

    We provide one clear engineering path based on judgment and cost reality. No inflated reports and no option sets built to justify presentation time.

  • Cost-Effective Systems

    We design systems that meet regulatory requirements without overbuilding. Designs reflect how projects are actually constructed, operated, and maintained.

  • Predictable Timelines

    Fewer submittal cycles and better coordination lead to faster approvals. Our drawings and narratives give reviewers what they need upfront.

  • Senior-Level Partnership

    Direct access to experienced engineers, clear communication, and respect for project schedules, budgets, and decision-making processes.

Get in Touch!

Have a question about our services? Not sure if you need an engineer?

FAQs

We work statewide. Our Texas office is based in McKinney, but we support projects across Houston, San Antonio, Austin, and rural counties throughout the state. Whether you are a developer pursuing a TCEQ permit, a municipality managing aging infrastructure, or an engineering firm that needs overflow support on a deadline, location is not a barrier.

Traditional discharge permits can run 18 to 36 months depending on project complexity and current TCEQ capacity. For qualifying projects, we pursue land application or beneficial reuse pathways that remove several of the longest steps. We have secured approvals in as little as 2 to 3 months using this approach. The right path depends on your site, your flows, and your timeline. We evaluate all three options upfront so you are not guessing.

We support Texas municipalities and special districts with distribution system modeling, wastewater collection and treatment design, pump station design, inflow and infiltration studies, regulatory compliance, and capital improvement planning. We also assist with State Revolving Fund applications and other infrastructure funding strategies. If your system is aging, underfunded, or facing a compliance deadline, we can help you build a practical path forward.

Yes. We work directly under your project manager as an extension of your team, producing CAD drawings, technical reports, and permit submittals under your standards and your brand. If your firm does water and wastewater work but lacks in-house capacity, we can step in as a specialty lead. Either way, your client relationship stays with you. We are here to make your firm look good, not to replace it.

Three paths are worth evaluating: connecting to a public system via force main, designing a package wastewater treatment plant with a discharge permit, or pursuing a land application or reuse authorization. Each carries different costs, timelines, and operational responsibilities. We run a feasibility analysis early so you know what each option looks like before any capital is committed. In unincorporated Texas counties especially, reuse and land application routes often outperform traditional discharge on both speed and cost.

Every deliverable we produce is reviewed by a licensed P.E. before it leaves our team. That is not a rubber stamp process. It means a practicing engineer checks the work against your project standards, catches issues before they reach your desk, and confirms the submittal is clean before you sign off on it. We also work within your file structure and drawing standards so the output integrates directly into your project without requiring reformatting or rework on your end.

Yes. We have experience supporting State Revolving Fund applications and can help your district move from identifying a need to having the engineering documentation required to qualify. That includes flow monitoring, I&I studies, feasibility reports, and the technical narratives that funding agencies require. Many smaller districts leave SRF money on the table because the application process feels overwhelming. We have helped rural and small-system clients secure significant funding by handling the engineering side of that process from start to finish.

The first step is a short conversation. Share your project type, location, and whatever utility information you already have. Whether you are a developer evaluating wastewater options, a district manager planning infrastructure upgrades, or a firm principal looking for reliable overflow support, we can usually give you a preliminary read within a week or two. No commitment required to have that first call.

We Speak the Language of Texas Water Agencies

Every agency whose logo appears below has specific standards for how water and wastewater projects get permitted, funded, and approved in Texas. We design to those standards so your project clears review without the revision cycles.