Modern Engineering Solutions

Modern Engineering Solutions

Get Started Today

70 / 100

Improving Water Quality with Mixers, Polymers, and Chloramines | Weftec Series | Podcast | EP4

MODERN ENGINEERING SOLUTIONS > BLOG > PODCAST >  Improving Water Quality with Mixers, Polymers, and Chloramines | Weftec Series | Podcast | EP4

-> Join Engineers For Communities Group on Linkedin
-> Watch this Live show here: LinkedIn 
-> If you are interested in being a guest on a live show fill book an Onboarding Call 

In this informative episode:

★ Focuses on providing cost-effective solutions for utilities to meet stringent water quality requirements.

★ David addresses the issue of water quality both at water treatment plants and in the distribution network.

★ Mixing water within the distribution network is crucial to prevent water from becoming stagnant.

★ Cleanwater1’s mixers are designed to be dropped into existing water storage tanks, preventing stagnation.

★ Their Polymer Activation System (Polyblend) optimizes the use of polymer in wastewater treatment, reducing costs by up to 40%.

★ Cleanwater1’s on-site chlorine generation system eliminates the need for transporting hazardous chlorine gas.

★ The system uses salt to generate sodium hypochlorite on-site, reducing costs and increasing safety.

★ David emphasizes the importance of monitoring water quality and offers a range of optical sensors for precise measurements.

Join us on this insightful Engineers for Communities new series episode 4 with our guest David Stanton from cleanwater1, as we dive deep into improving water quality with mixers, polymers, and chloramines.