Modern Engineering Solutions

68 / 100 SEO Score

Modern, Cost-Effective Water and Wastewater Engineering

We are a Colorado based water and wastewater engineering firm helping municipalities, developers, and engineering partners deliver infrastructure projects faster, with fewer revisions and predictable costs.

Our work focuses on clear recommendations, practical system design, and permitting strategies that reduce delays and avoid unnecessary construction expense. We built our delivery model around outcomes over billable hours, so projects move forward instead of stalling in review cycles.

Engineering Built for Outcomes, Not Overhead

Water and wastewater projects fail when schedules slip, designs overreach, or permitting risks are not addressed early. We engineer with those realities in mind.

Value Over
Hours 

We do not bill by the hour. We price water and wastewater engineering services around outcomes such as permits secured, schedules protected, and systems sized correctly for construction and long-term operation. 

Speed as a Design Constraint 

Time to permit and time to water matter as much as hydraulics and code compliance. We treat schedule as a core design input from day one because delays often cost more than design fees. 

Deep Work, Not Meeting Culture 

Our engineers are organized for focused problem solving, not constant meetings. Fewer handoffs and fewer revisions lead to cleaner submittals and faster regulatory review. 

AI as Leverage, Not a Shortcut 

We use AI to streamline drafting and documentation so licensed professional engineers can focus on judgment, coordination, and quality. All technical decisions are made and reviewed by PEs

Who We Support

We support clients who need water and wastewater engineering expertise without large-firm overhead or slow delivery. 

Municipalities and Water Districts

Small and mid-sized communities facing aging infrastructure, compliance requirements, or funding deadlines. We deliver clear recommendations and designs aligned with local budgets and operational realities. 

Developers and Industrial Owners 

Developers and industrial owners who need fast feasibility answers, realistic construction costs, and a clear path through CDPHE permitting before capital is committed. 

Civil Engineering Firms

Civil firms without in-house water or wastewater capability or firms facing PE bottlenecks. We act as a quiet, dependable utility partner so projects move forward. 

Water and Wastewater Engineering Services

We provide comprehensive water and wastewater engineering services with a focus on constructability, permitting success, and cost control.

Our Process

Concept → Permitting + Drawings (parallel) → Construction

Wastewater Engineering

Wastewater collection systems, lift stations, treatment plants, infiltration and inflow studies, and facility upgrades. One clear recommendation, realistic cost expectations, and submittals designed to move through review with minimal revisions. 

Water Engineering

Water wells, storage, distribution, and treatment systems designed around source conditions, growth projections, and construction budgets. Early feasibility clarity and designs that protect project schedules. 

Civil and Site Utility Support

We handle the water and wastewater portion of civil projects so internal teams can move faster. Ideal for firms needing dependable overflow support or specialized utility expertise. 

Construction Administration

We stay engaged during construction with fast responses and clear clarifications to prevent change orders caused by ambiguity or misalignment. 

Get Permit Timeline And Cost Estimate

Experience and Results

Our team has delivered water and wastewater engineering projects across multiple states and regulatory environments, including CDPHE jurisdictions.

Typical outcomes include faster approvals, reduced construction costs through right-sized design, lower infiltration and inflow, and clearer project budgets and schedules. Shape

300+ Water and Wastewater Treatment Projects

Licensed in 8 states

40+ Professional Engineering Team

Blog/Newsletter

Hydraulic modeling diagram showing water pressure loss in a three-story Texas affordable housing development falling below the 20 PSI state minimum

Texas needs $154 billion to fix its water infrastructure but committed only $20 billion. With 186 billion gallons lost annually and pipes dating to the 1890s, developers face serious project risks from aging municipal systems.

Why Choose Modern Engineering Solutions

  • Clear Direction

    We provide one clear engineering path based on judgment and cost reality. No inflated reports and no option sets built to justify presentation time.

  • Cost-Effective Systems

    We design systems that meet regulatory requirements without overbuilding. Designs reflect how projects are actually constructed, operated, and maintained.

  • Predictable Timelines

    Fewer submittal cycles and better coordination lead to faster approvals. Our drawings and narratives give reviewers what they need upfront.

  • Senior-Level Partnership

    Direct access to experienced engineers, clear communication, and respect for project schedules, budgets, and decision-making processes.

Get in Touch!

Ready To Get Your Project Permitted Faster?

Contact us at Modern Engineering Solutions today to learn how we can cut months off your permitting timeline and get your project to construction faster