Pump Station Design
Water flow and drainage are extremely important for your property so that you do not end up with drainage buildup , stagnant water, or a loss of water. If you have flow issues or need water re-directed against gravity, then you might need a pump station or lift station.
Pump Station
A pump station helps transport water to a higher elevation. This is common if you have uneven terrain on your property.
Lift Station
A lift station helps move sewage and wastewater to a higher elevation so that it is properly drained from the property.