Modern Engineering Solutions

Call or Text Us!!! (214) 833-6748

Meeting with Mike, P.E.: Schedule A Time to Chat!

Modern Engineering Solutions

CONTACT US NOW

Speed Up Your Projects by 25% with our 24/7 Civil Engineering.

Regain confidence in your project from schedule to submittal!

How We Can Help With Your Project

SAVE TIME

Access our global workforce for around the clock progress

COMPLETE
SUBMITTALS

We get it done,
so you don’t have to.

BECOME
COMPLIANT

We help you stay on top of changing local and state regulations.

Partners with
Partners with

Land developments, subdivisions, detention ponds, and the list goes on. We had no idea that Michael Groselle owned engineering firm called Modern Engineering Solutions did so much in Texas and Colorado states. They are truly amazing team.

D Zamalis

We have been working with Modern Engineering Solutions for the past two years. Mike team has been super experienced and skillfull to handle our all projects. We appreciate our working relationship with MES and we hope to get done many more projects in time to come.

Josh Firth

Modern Engineering Company is the best remote civil engineering company that I have ever used. The civil engineers are incredibly knowledgeable, professional and always available to help. They always go above and beyond to help me meet my deadlines. I would highly recommend them to anyone looking for a reliable civil engineering company.

Kelsi Kuhn

Google Review

Land developments, subdivisions, detention ponds, and the list goes on. We had no idea that Michael Groselle owned engineering firm called Modern Engineering Solutions did so much in Texas and Colorado states. They are truly amazing team.

D Zamalis

We have been working with Modern Engineering Solutions for the past two years. Mike team has been super experienced and skillfull to handle our all projects. We appreciate our working relationship with MES and we hope to get done many more projects in time to come.

Josh Firth

Modern Engineering Company is the best remote civil engineering company that I have ever used. The civil engineers are incredibly knowledgeable, professional and always available to help. They always go above and beyond to help me meet my deadlines. I would highly recommend them to anyone looking for a reliable civil engineering company.

Kelsi Kuhn

Why Clients Choose Modern Engineering Solutions
For Their Next Project

Google Review
Taylor Pearson
Taylor Pearson
May 4, 2023
The professionalism and care for the projects and owners that Mike oversees is extraordinary. You can tell that the project/design means a great deal to Mike and his staff, and that is evident in the success that they bring. Having worked with Mike on previous projects, I can guarantee a rewarding experience working with Mike and his staff.
Tia Mithun
Tia Mithun
April 5, 2023
Working with MES and Big Mike has been a great experience.
Tamanna parvin
Tamanna parvin
February 18, 2023
What a great experience working with them
D Zamalis
D Zamalis
January 20, 2023
Land developments, subdivisions, detention ponds, and the list goes on. We had no idea that Michael Groselle owned engineering firm called Modern Engineering Solutions did so much in Texas and Colorado states. They are truly amazing team.
Laura Cunha
Laura Cunha
December 27, 2022
After meeting with several civil engineers to consult for my land project, I didn’t feel like hiring them. I then contacted Mike at Modern Engineering Solutions and he was able to take me through the complete process and convince me to hire him for this work. His team is professional and very communicative! His project manager answered my every question during the design phase. We’d definitely work with MES again.
Josh Firth
Josh Firth
November 10, 2022
We have been working with Modern Engineering Solutions for the past two years. Mike team has been super experienced and skillfull to handle our all projects. We appreciate our working relationship with MES and we hope to get done many more projects in time to come.
Kelsi Kuhn
Kelsi Kuhn
July 19, 2022
Modern Engineering Company is the best remote civil engineering company that I have ever used. The civil engineers are incredibly knowledgeable, professional and always available to help. They always go above and beyond to help me meet my deadlines. I would highly recommend them to anyone looking for a reliable civil engineering company.
Ian Carlson
Ian Carlson
June 24, 2022
I contacted Michael Groselle from Modern Engineering Solutions to help with the design of a detention pond for one of my project in the city of Lakewood, CO a the suburb in the Denver. They were very responsive and provided a detailed plan that met all of my requirements. The team was professional and easy to work with. I highly recommend their services.
Jon Canon
Jon Canon
April 21, 2022
I have used Modern Engineering Solutions for grading designs on a few occasions and have always been happy with the work I have received. His team is very knowledgeable and professional, and they were able to turn around my plans quickly and without any issues.

Blog

Communicate with Confidence

Get your project approved faster with our team!

CALL OR TEXT US!!!!!

Civil Engineering Services in McKinney, Texas

Modern Engineering Solutions is a civil engineering firm in McKinney TX. They are able to handle projects of most sizes and scopes. Modern Engineering Solutions, LLC has the experience and expertise necessary to meet the needs of each client they work with.

If you are in need of civil engineering services in McKinney TX, you can rely on the professionals at our company. We can help with a variety of projects, from preparing and issuing permits to designing and constructing infrastructure. We have the experience and expertise necessary to get the job done right, and we always work closely with our clients to ensure that they are happy with the results. Contact us today to learn more about our services or to schedule a consultation.

McKinney civil engineering services cover a wide range of projects. Our company has worked on everything from the construction of wastewater treatment systems to building retaining walls for commercial properties. We offer a wide range of services, including:

Civil Engineering

Civil engineering design is a process that starts with understanding the needs of the client and ends with the development of a plan or blueprint to meet those needs. Some common types of engineering designs offers are:

  • Paving Plans: Modern Engineering Solutions deliver plans from roadways to parking lots. Our McKinney professional designer can work with client from plan of idea that required paving infrastructure surrounding a development.
  • Grading Analysis: We have certified professional engineer can help with site which requires thorough Most site needs to understand how much soil needs to be hauled or removed from a site. MES will build a 3D model of your site and compare it to existing conditions. MES will then prepare a report that specifies how much soil if any, your site requires.
  • Utility Design: From roads and parking areas to water and sewer networks, Modern Engineering Solutions in the city of McKinney will be with you the through out the process. Our designer are best of engineers in the McKinney, TX and can construct new roadways or conceptual plans for paved infrastructure based on a certain development. These structures will need to have storm sewer, water, and wastewater supplies to serve the region. We also provide fire flow analysis on main waterlines and as well determine existing and proposed sewer lines capacities.
  • Detention Pond Analysis: You will most likely need a detention pond for your development project. Detention ponds are by design defined by areas that do not hold water and require drainage at a predetermined rate. Detention pond design can get even more complicated if it flows through wet terrain.
  • Pump/Lift Station Design: It is essential that you have sufficient flow through your property and that drainage levels are steady so you don’t put yourself at risk for clogging, stagnant water, or water-loss. If water flow is insufficient and you need water to be rebalanced or redirected by gravity, a pump station or a lift station might be a useful investment.
Site Plan

Modern Engineering Solutions, McKinney, TX work from beginning of site planning idea and analysis for our clients on commercial, residential developments, and industrial spaces by uniting in every level to deliver project design come to reality. During the development stages We will be diligent in facilitating the planning procedure by working closely with the client, city authorities, consultants, and other review town officials involved in this project to ensure that the site planning process is successful and also cost-effective. As well, MES will closely evaluate the sightseeing site to make sure that the project is both economically and viable.

This type of drawing is used by architects, landscape architects, urban planners, and engineers to show the existing and proposed conditions for a given parcel of land to be modified. Modern Engineering Solutions can help draft your website design layout for your venture. The following is a list of some of the major parts for your project along with the website layout.

  • Zoning Change Requests
  • Planned Developments
  • Specific Use Permits
  • Conceptual Site Layouts
  • Platting
  • Property Due Diligence
  • Land Subdivision
  • Site Investigation Reports
  • Site Optimization
Water and Wastewater Planning in McKinney, Texas

Modern Engineering Solutions can design systems of water or wastewater, and can generate master plans for them. Our staff also can work on your regulatory support needs and perform other asset management tasks. Modern Engineering Solutions, McKinney, TX is a reliable source for big picture solutions that can help you maximize the use of existing infrastructure and prioritize solutions within your system.

The main areas of expertise are as follows:

  • Strategic Planning
  • Water and Wastewater System modeling
  • Capital Improvement Plans (CIP)
  • Operational Assistance
  • Infiltration and Inflow Studies
  • Regulatory assistance
  • Impact Fee Programs
  • Compressive rate studies
  • State Revolving Fund (SRF) project assistant

Construction phase services are a necessity for any construction project. Modern engineering solutions can help streamline the process and save time and money. From surveying to construction management, our team can provide the necessary support to get your project completed on time and within budget. Project Management Services Managing a construction project can be extremely time consuming and complicated. Our team of project management specialists will work with you to ensure your project is completed on schedule and within budget. We are ready to help with any size project, from small specialty projects to large commercial ones.

  • Conclusion Construction Management: In many instances, it is beneficial to have developers make use of the technical performance data on capital expenditures that their engineering solutions have collected throughout the life of the project. Modern Engineering Solutions provides on-site site visits to check the project as it is built, whether it’s a Modern Engineering Solutions operation and maintenance original project or another engineer’s project. These visits can ensure that the overall project is carried out in line with specifications for efficiency and functionality. Modern Engineering Solutions has a number of options for subcontractors and suppliers that help to improve the quality of the buildings that are delivered. These range from providing on-site inspections by engineers or architects, to providing off-site inspections and even full design services for buildings.
  • Quantity Takeoff: Modern Engineering Solutions, LLC is highly skilled at performing quantity takeoffs (QTO). They help to make in-depth assessments of materials and labor needed to complete a construction project. These estimates are created during the drawing-phase of the construction project process. QTOs are more beneficial when they are broken down into smaller and manageable units that are less difficult to measure or estimate. Experienced estimators have developed procedures to help them quantify their work. Modern Engineering Solutions, LLC will provide a detailed report of the materials and labor needed to complete an entire project. This is extremely beneficial when multiple projects are being created at one time.
  • Bid Phase: With a professional contractor, We can assist the customer with the process of selecting contractors as well as evaluating and comparing bids in the McKinney city.

At Modern Engineering Solutions, McKinney TX, our team member will work side by side with you to make sure your project is designed as you intended it. Please contact us on (214) 833-6748 or email us on [email protected]!

Certificate & Licensed